Analyze & Prepare Cash Flow Analysis

EOB Consulting will combine the Competitive Analysis, CAD Design, Wetland Mitigation and Estimated Construction Cost Analysis to create an Estimated Cash Flow Analysis taking into consideration:

Annual Inflation (Construction Costs, Rent and Operation Costs)
Construction Costs / Wetland Mitigation Costs
Rental Rates
Average Annual Occupancy Rate
Revenue
Estimated Operating Costs
10-year Cash Flow

EOB Consulting will provide you with a Cash Flow Analysis for the first 10 years of operation complete with an estimated Return on your Investment with and without Debt. Investors require this type of complete analysis before considering providing a loan for any project.

This is one step in preparing a Feasibility Analysis

This is necessary to prepare the Business Plan for Investors

This is one step in Maximizing the PROFIT per acre

WANT TO BUILD A SUCCESSFUL RV PARK?Visit these pages.

How to Start an RV Park
RV Park Consulting
RV Park Design

Get In Touch

Ed O. Bridgman MBA, PMP
Lean Six Sigma Master Black Belt

10550 Pioneer Rd.
Theodore, AL 36582

512-785-1379 (direct)

251-367-2409 (secondary #)

EOB@EOB-Consulting.com